Technical brief
Geometry, loads, required scope, fire, acoustics, thermal performance, transport and installation conditions.
OCELIS manufactures light-gauge steel structures for developers, general contractors, designers and construction companies—from the manufacturing model and profiles to prefabricated frames and installation of the primary load-bearing structure.











The system delivers its greatest value where low self-weight, precise digital preparation, dry installation, prefabrication and repeatability matter. Every project still requires its own structural design, build-ups and coordination of disciplines.
How the system works →The scope is always defined by the quotation and contract. Sheathing, windows, services, handling and finishing work are not included automatically.

Structural-system coordination, phased production, façade frames and structural frames.
Find out more →
Low self-weight and a dry process for existing buildings.
Find out more →
Load-bearing structure supplied as a kit, frames or an installed assembly.
Find out more →Geometry, loads, required scope, fire, acoustics, thermal performance, transport and installation conditions.
Qualified designers define the load-bearing system, connections, anchoring, bracing and interfaces with other parts of the building.
The approved design is converted into manufacturing data defining lengths, holes, embossments and the marking of individual members.
Incoming-material inspection, CNC forming, marking, production inspection and documentation within the agreed scope.
Delivery of profiles, a structural kit, pre-assembled frames or installation of the primary load-bearing structure.

The best result comes when manufacturing capabilities, logistics and installation are considered from the design stage. We provide profile geometries, detail consultations and conversion of the approved solution into a manufacturing model.
The certified factory production control system covers responsibilities, incoming inspection, manufacturing procedures, measurements, non-conformity records and documentation. Neither CE nor EN 1090 replaces the structural, fire, acoustic or thermal assessment of the complete building.
Certification and documentationWe do not develop the manufacturing system in isolation. We connect design and construction experience with research, education and the development of compatible building assemblies.
Cooperation with the academic environment, students and construction experts connects education and research with real manufacturing practice.
Learn more ↗Expert cooperation with the University Centre for Energy Efficient Buildings supports the development and verification of solutions for modern, energy-efficient construction.
Learn more ↗We address interfaces between the steel structure, boards, insulation and façade systems, and prepare OCELIS Open professional events together.
Learn more ↗Certification is the foundation. Final quality also depends on correct design, controlled manufacturing, coordinated assemblies, competent installation and documented handovers.

We cooperate with the secondary construction schools in Ostrava and Havířov. Students and teachers can follow the path from design and production data to the formed profile, assembly and quality control.
The project ran from 20 February 2024 to 31 August 2026 and is now complete. It provided students with practical education in a real company environment and connected design, production and installation.
That is why we are developing the Steel Academy for installation companies, OCELIS Open technical days with Saint-Gobain and an online installation course now in production.
Steel Academy and technical events →Practical training for installation companies: documentation, setting out, anchoring, temporary bracing, connections, inspection and handover.
Steel Academy and technical events →02Open technical events connecting structural manufacturing and installation with sheathing, insulation and related build-ups.
Steel Academy and technical events →03The online course is in preparation. Installation videos, the correct work sequence and quality checkpoints will be published after completion and technical review. Use the form to request a launch notification.
Online course information →
How to select a scope that matches the project, the contractor’s capabilities and the required level of prefabrication.
Read article →
Low self-weight is an advantage, but the survey, structural capacity, fire strategy, approvals and logistics decide feasibility.
Read article →
Cooperation with secondary construction schools, technical visits, student projects and transparent school-project publicity.
Read article →Our channel explains assembly principles, design coordination and real project experience.
Open on YouTube ↗Our channel explains assembly principles, design coordination and real project experience.
VideosSend plans, sections, site location, required delivery scope and target date. We will propose the next steps.