How to select a scope that matches the project, the contractor’s capabilities and the required level of prefabrication.
One system, four different scopes
Not every project requires the same delivery. The basis is an approved production model and a clearly defined interface between OCELIS, the designer and the installation contractor.
1. Profiles only
Formed and marked profiles are supplied from approved production data. Cutting, holes and identification support assembly, while responsibility for installation and inspection follows the agreed contract scope.
2. Structural kit
Profiles are organised as a complete wall, floor or roof system, with assembly documentation and the fasteners explicitly listed in the quotation.
3. Prefabricated frames
Selected wall, floor or roof frames are assembled in the factory. Site operations include lifting, positioning, temporary bracing, anchoring and coordination with other trades.
4. Primary frame assembly and ENVEO
Assembly means installation of the load-bearing system within the contracted scope, not an automatic turnkey building. ENVEO is a higher off-site prefabrication level with layers defined by the project-specific build-up.
What must be defined before ordering
Required scope, structural design, openings and penetrations, anchoring, lifting, scaffolding, site access, programme and interfaces with cladding and other trades.
The specific scope, documentation and responsibilities always follow the quotation, contract and project documentation.