Frequently asked questions

Technical answers without shortcuts.

The project-specific design and contract always take precedence over a general website answer.

Scope and ordering

Which delivery scopes does OCELIS offer?+

From individual profiles and structural kits to prefabricated panels, installation of the loadbearing frame or a higher degree of ENVEO off-site prefabrication. We select the right option around the project stage, programme, installation team and project-team requirements.

What does complete assembly mean?+

It means assembly of the primary load-bearing structure within the agreed scope—not automatic cladding, insulation, windows, MEP, lifting, scaffolding or finishes.

Is plasterboard included automatically?+

No. Boards, insulation, membranes and other layers must be explicitly listed.

Does OCELIS deliver turnkey buildings?+

OCELIS is primarily a structural-system manufacturer. A wider scope can be coordinated through the design office and partners, but every trade must be contractually defined.

What should an enquiry include?+

Send what is available now — a brief, sketch, study or developing design. Plans, sections, site information, required scope and any structural or fire-safety documents help us start faster, but they are not required for the first consultation.

Design, structural engineering and documents

Can a masonry design be converted to OCELIS?+

In most cases, yes. We review the existing design and propose the structural, build-up and detail changes needed for a technically and administratively sound conversion.

When can windows and doors be ordered?+

Windows and doors can be ordered once final opening dimensions, reveals and installation position have been approved in the production model — often before frame installation starts.

Which documents are supplied?+

Depending on scope: production and assembly documents, part identification, declaration of performance, CE and material documents such as 3.1 when required or ordered.

Does EN 1090 certify fire or acoustic performance of the building?+

No. EN 1090 concerns manufacture of the steel structure. Fire, acoustic and thermal performance belong to the complete build-up and project.

Is every frame structurally the same?+

No. Profiles, thicknesses, spacing, bracing, connections and anchors are designed for the specific geometry and loads.

Assembly and contractors

Is assembly always faster?+

Accurate off-site preparation and a dry process allow the loadbearing frame to be installed very quickly without curing delays. We confirm the programme according to building size, prefabrication level and site readiness.

Can the frame be assembled without a crane?+

With a structural kit, individual profiles are generally assembled by hand. The need for lifting equipment increases with the level of prefabrication, particularly for large frames, panels, floor and roof assemblies.

Can our contractor assemble it?+

Yes. The installation contractor receives the necessary documentation and technical support. Before a first project, we recommend practical OCELIS Academy training or on-site support from our technician.

Who is responsible for temporary bracing?+

The contract and installation plan must define responsibility. The structure is not automatically stable at every assembly stage.

What is checked when the assembled structure is handed over?+

Geometry, anchoring, connections, bracing, condition of the protective surface finish, compliance with documentation and the agreed scope. The inspection result is recorded.

Material, durability and sustainability

How long does the structure last?+

A warranty of up to 50 years can be agreed for the loadbearing structure; the exact term and conditions are stated in the schedule to the contract. Long-term performance depends on the environment, protective surface finish, detailing, correct installation and protection from moisture.

What is the difference between Z275 and ZM310?+

These are different metallic protective layers with different coating masses. Selection follows the environment, structural detail and project requirements.

Does a steel house have poor mobile signal?+

Yes, mobile phones and Wi-Fi are used normally in steel buildings. Signal quality depends mainly on local coverage and the complete building envelope, as in other modern buildings.

Is the structure sustainable?+

Steel is fully recyclable and digitally controlled manufacturing reduces offcuts and waste. Low weight and prefabrication can reduce transport demand and site work. We provide available material and production data for project assessment.

Does OCELIS have BREEAM certification?+

BREEAM assesses the building as a whole, not an individual construction product. OCELIS therefore cannot be ‘BREEAM certified’ as a product, but it can support assessed criteria through material documentation, waste reduction and controlled manufacturing.

Approvals, grants and economics

Is OCELIS always cheaper than masonry or concrete?+

No. Economics depend on design, repetition, weight, logistics, programme, foundations and prefabrication. The whole solution must be compared.

Can a building use a grant?+

Grants usually apply to the whole building or specific energy measures, not automatically to the structural material.

Does a tiny house require approval?+

It depends on location, purpose, size, connections, mobility and site conditions. Check the current rules and authority before construction.

Do thinner walls always create more usable area?+

In comparable build-ups, OCELIS can provide more usable area at the same footprint thanks to its slender loadbearing structure. The actual gain depends on thermal insulation, fire safety, acoustic performance and façade requirements.

Where will terms and current documents be published?+

Current terms are available here: consumer terms and business terms. Certificates and technical documents are in the Technical Library.

Project enquiry and technical consultation

Let us start with a technical review of your project.

Send plans, sections, site location, required delivery scope and target date. We will propose the next steps.