Duplex rooftop extension in Opava

A prefabricated steel rooftop extension assembled in winter, with rapid enclosure protecting the occupied flat below.

Duplex rooftop extension in Opava

A prefabricated steel rooftop extension assembled in winter, with rapid enclosure protecting the occupied flat below.

Starting point

Assembly took place in winter above an occupied flat. Limiting the time for which the lower part of the building could be exposed to weather was therefore critical.

Solution and delivery

Pre-prepared profiles, coordinated transport and immediate assembly avoided unnecessary process delays and allowed the structure to be enclosed quickly.

Outcome or current status

According to the project brief, the flat below remained protected from weather throughout the works. The case demonstrates the value of precise preparation and logistics for rooftop extensions.

Data transparency

Source: the OCELIS project brief “Reference – textace”, version dated 7 August 2026. Dimensions, delivery year and contractual details not stated in that brief are not estimated here.

Technical consultation

Are you planning a similar project?

Send plans, sections, the site location and required scope. We will begin by reviewing the technical brief and interfaces.