A load-bearing bouldering-wall structure supplied with structural design as a precisely prepared kit for clean assembly.
Starting point
The structure had to carry the operational loads of the bouldering wall and resolve the technically sensitive anchoring of ties into the plywood skin.
Solution and delivery
OCELIS prepared the structural design and calculation, manufactured labelled kit components and resolved the tie details so that assembly required no on-site cutting, grinding or painting.
Outcome or current status
The structure was delivered to Harrachov and assembled as a system kit. Public documentation shows the completed bouldering wall in its operating space.
The scope and delivery are confirmed by a public post from OCELIS founder Robin Vašnovský. An internal OCELIS handover record also confirms unloading in Harrachov on 7 November 2025. Dimensions and price are not published without a public source. Open the public source ↗

