An infill structure in a hall can create offices, welfare facilities, operational rooms, partitions or an additional floor. Low weight and a dry process are major advantages, especially when the building remains in use during construction.
Start with the existing structure
Lightweight dry construction can minimise intervention in an operating hall, but existing capacity, fire strategy and movement of the primary structure must be verified.
Survey the existing hall
Geometry, load paths, crane operations and available connection points need confirmation.
Allow for movement
Deflection and movement joints may require sliding head details and separation from cladding.
Coordinate fire performance
Compartment walls, penetrations and junctions must follow the approved fire safety design.
The specific structure, build-up and delivery scope are governed by the approved project documentation, contract and applicable regulations.